Tuen Mun – chek lap kok link southern connection viaduct section
Construction of Retaining walls viaducts linking North Lantau Highway on Lantau Island to the Boundary Crossing Facilities, and artificial island connected to Hong Kong International airport on Chek Lap Kok.
Design and Supply of Reinforced Earth Abutment Wall
Design and Supply of Reinforced Earth Abutment Wall at Prince of Wales Hospital (PWH)
Remaining Engineering Infrastructure Works at Pak Shek Kok Development
Reinforced Earth Wall system works at Pak Shek Kok Development
Upgrading of ting kok road between tai po fire station and shuen wan
Successful alternative design for a Reinforced Earth® Wall to replace an alternative solution which entailed building a bored pile wall.
Regulation of Shenzhen river stage 111 phase 11 contract B
Successful alternative design for a Reinforced Earth® Wall to replace the original design with a bored pile wall at Shenzhen river.
Design, material supply, on-site casting, and construction of Reinforced Earth® wall structures for Philippines’ Cebu Airport
Design, material supply, on-site casting, and construction of Reinforced Earth® wall structures for Philippines’ Cebu Airport
First Low Carbon Footprint MSE Wall in the Philippines
First Low Carbon Footprint MSE Wall in the Philippines
Slope Protection and Drainage Improvement at Tindharia on National Highway 110 (Previously Nh-55) in Darjeeling District of West Bengal, India
Construction of Reinforced Earth® wall at Trumpet Interchange of Phase I on NH-07 at Bengaluru International Airport in the state of Karnataka, India.
Coastal Embankment Protection at Maheshkhali
COASTAL EMBANKMENT PROTECTION USING TECHREVETMENT® SYSTEM AT DHALGHATA, MAHESHKHALI, BANGLADESH